Loading plans
Container-by-container packing so nothing arrives missing or crushed.
From a 96-module refugee camp in Germany to a 500-module mining camp in Guinea — engineered in Weifang, shipped in containers and bolted up on site by local crews with our drawings and supervision.
Client — Winning Consortium Simandou (WCS)
A large workforce camp for one of the world's biggest bauxite and iron-ore developments. Dormitories, canteens, offices and ablution blocks in detachable container modules, engineered for a remote operation.
Modules were shipped flat-packed, then opened, combined and stacked two storeys high on prepared red-earth foundations with crane support — a full accommodation village assembled to schedule.



Client — COBAD – RUSAL
A mining accommodation camp delivered as detachable container modules — dormitories, sanitary and facility blocks assembled quickly on a prepared pad, with finished interiors and corridors ready on arrival.
Client — TYAZHMASH
Accommodation for a hydropower station project — a tidy white-and-blue camp of dormitories, canteen and offices arranged around landscaped paths.
Detachable units were stacked two storeys high with external steel staircases and fitted out with finished interiors, lighting and sanitary facilities.






Client — EBV-group
A refugee accommodation camp in a German river valley, supplied to EN (CE) expectations — container modules with finished kitchens and bathrooms.
Units were craned into neat rows on a paved site and connected up, giving habitable, fully serviced housing in a fraction of conventional build time.
Client — UMMO
A prefab building complex of over 3,000 m² — two-storey blocks on a light-steel frame with finished facades, external staircases and insulated envelopes.
Delivered as a numbered kit and erected on site by a local crew working from our drawings and bolt schedules.
Client — Confidential
Two-storey prefab buildings assembled from a pre-engineered steel frame and insulated panels — offices and accommodation raised quickly by a local crew from our drawings and member-marked steel.
Every project leaves with the drawings, schedules and support a local crew needs to put it together right the first time.
Container-by-container packing so nothing arrives missing or crushed.
Members and panels marked to the erection drawings for sequence assembly.
Our engineers stay reachable through assembly, with supervision available.
Tell us the country, the use and the rough size — we will scope it and quote.